Line Upgrade and Disaster Recovery tests - downtime expected
Scheduled Maintenance Report for Digital Craftsmen
Completed
The scheduled maintenance has been completed.
Posted Oct 18, 2022 - 01:30 BST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Oct 18, 2022 - 00:00 BST
Update
Hi,

Apologies for any confusion, although the subject is correct, the date in the body of the email wrongly said November . This maintenance is due for a weeks time on Tuesday the 18th of October.

Sorry,

Paul
Posted Oct 11, 2022 - 15:24 BST
Scheduled
Tuesday 18th October - 00:00 to 01:30

Please note : Only Datacentre hosted clients are affected, AWS and Azure clients are unaffected by this maintenance.

DCL will be conducting two phases of work during this period. The first is to upgrade the connectivity between our datacentres and improve resilience further, the second is a series of disaster recovery tests ensuring that our systems fail and auto-recover in the way we expect them to.

The first set of work is expected to take place between 0000 and 0030. We will be installing a third backup inter datacentre comms line routed across different networks to our existing diversely routed lines, to improve resilience and speed. During this 30 minute window, connectivity to and from client machines will be affected and several periods of website downtime are to be expected as the network re-routes to include the third line and we perform final testing.

The second set of work is our Disaster Recovery Tests which are critical to ensure that the systems are as resilient as they should be and that failovers occur as expected within our infrastructure. During this phase no downtime is expected but there may be few second blips in connectivity as services re-route around the planned failed components like switches and SANs.

Apologies for this downtime and risk but it is critical to ensuring the platform performs as expected. If you have any further questions please get in touch.

Regards,

Paul Orrock
Technical Director

Digital Craftsmen Ltd.
Coppergate House, 10 Whites Row, London, E1 7NF
t: 020 7183 1410 * f: 020 7099 5140 * m: +44 (0)7769 972707
e: PaulO@digitalcraftsmen.com * w: http://www.digitalcraftsmen.com/
Posted Oct 11, 2022 - 12:56 BST
This scheduled maintenance affected: Infrastructure (Core network).